There is no sales volume requirement within the first two years. From the third year onwards, the annual sales volume should reach over US$100,000.
Goods from other suppliers can be delivered to our factory. Then they will be loaded together for the shipping process.
Spring Festival holiday: 10 days before the festival and 10 days after the festival, with a total of 20 days off for the Spring Festival.
Our products can be installed as long as the conditions of the medium fluid permit.
Yes, it is possible.
We have exhibition plans every year. The venues are Shanghai and Guangzhou.
Provide Design Plan: Based on the structural performance and technical requirements of the product, generally, a design plan can be provided within 7 working days.
ISO-9001 / KC
50 employees.
The factory is 5 kilometers away from the hotel.
The factory is 60 kilometers away from the airport.
Yuhuan City,Zhejiang Province,CHINA
OEM is acceptable.
Samples are chargeable.
Payment terms: 30% down payment,TT70%
We are a physical manufacturing factory.
Delivery time: It will be within 30 - 60 days after receipt of the deposit. The specific time is determined according to the actual situation of the product coefficients.
Our factory has 10 production lines, each of which can produce 10,000 finished products per month.